Industrial account researchIreland, the UK and the EU

Research guide · Source evidence and limits

Which Irish manufacturers are investing in decarbonisation?

Public SEAI and Enterprise Ireland programme data can show that Irish firms are being funded to plan or invest in decarbonisation, but neither body publishes a complete public list of grant recipients. What is public are the scheme rules, official totals, selected case studies and, sometimes, a firm’s own announcement. Those sources are useful account signals if they are read as what they are, not as a supplier shortlist.

Demand Range researches industrial accounts in Ireland, the UK and the EU. This page owns one thing: how to use public Irish decarbonisation grant and programme data, mainly from the Sustainable Energy Authority of Ireland (SEAI) and Enterprise Ireland, as account signals. For who must have an energy audit, published Action Plans and SEAI’s Large Industry Energy Network, see energy-audit signals for industrial suppliers.

01 / key facts

Key facts

SEAI and Enterprise Ireland programme publications; extracted 24 November 2026.

  • SEAI’s Excellence in Energy Efficient Design (EXEED) grant can provide up to €3 million per project for energy-efficiency and renewable-energy investments on non-domestic buildings and processes, including new and upgraded manufacturing processes. The 2026 scheme is open year-round.[1][2][3]
  • 2024 approvals, from SEAI’s Annual Report 2024: SEAI approved EXEED grant support to 44 companies, totalling €7.2 million.[4]
  • 2024 and 2025 outturn, from SEAI’s Programme Impact Report 2025, Table 3: 12 EXEED grants supported in 2025, with €4.5 million of SEAI capital spend and an estimated €15 million of private spend leveraged. The same table’s 2024 outturn was 14 grants supported and €1.8 million of capital spend. That outturn series is not the same as the 2024 approvals figure.[5]
  • Payments by year, from a Dáil written answer of 18 September 2025: 61 businesses were paid under EXEED in 2023, 49 in 2024, and 36 in 2025 to the end of August.[6]
  • Enterprise Ireland’s Green Transition Fund was announced in June 2022 as a €55 million fund for 2022 to 2026, with a Climate Planning Fund for Business (€25 million) and an Enterprise Emissions Reduction Investment Fund (€30 million) aimed at manufacturing investment of up to €1 million per project.[7][13]
  • On 12 November 2024, Enterprise Ireland said it had approved over €55 million, under the Environmental Aid scheme and the Green Transition Fund, to more than 400 Irish companies since June 2022, with an estimated 130,000 tonnes of carbon dioxide abated.[11]
02 / what the public record shows and what it does not

What the public record shows — and what it does not

What is published, and is usable with care:

  • Scheme rules and award ranges. SEAI and Enterprise Ireland set out who can apply, what costs are eligible and the maximum grant for each support.[1][2][3][8][9][10][12]
  • Official totals. Annual reports, impact reports, department announcements and Dáil answers publish counts and euro amounts. They rarely name the firms behind the totals.[4][5][6][11][13]
  • Selected case studies and company announcements. SEAI publishes chosen EXEED case studies, and some firms describe a grant in their own news or reports. Those are examples, not a register, and they are not reproduced here.
  • Larger aid awards. Some larger awards may also appear in official state-aid transparency sources. That is a separate record.

A figure about “companies supported” tells you that funded work exists in the country, and at what scale. It does not identify the firms.

04 / enterprise ireland climate and emissions reduction supports

Enterprise Ireland climate and emissions-reduction supports

In June 2022 the Department of Enterprise announced a €55 million Green Transition Fund, to run from 2022 to 2026, administered with Enterprise Ireland and funded through Ireland’s National Recovery and Resilience Plan. It had two streams: a Climate Planning Fund for Business (€25 million) and an Enterprise Emissions Reduction Investment Fund (€30 million) for manufacturing businesses investing in lower-carbon processes, energy monitoring and related research.[7][13]

The planning stream, as published in 2022 and still described on Enterprise Ireland’s support pages on 24 November 2026, includes:[7][8][9][10]

Support What it is for Published award
Climate Action Voucher An initial sustainability, decarbonisation or circular-economy plan, with an independent adviser or trainer Maximum award of €1,800
GreenStart A short in-company assignment with a sustainability consultant Up to 80% support, to a maximum grant of €5,000
GreenPlus A longer assignment with an external environmental expert, including eligible training A grant of up to €50,000; the 2022 announcement set this at up to 50% of eligible costs

The 2022 announcement also listed a strategic consultancy support, at up to €35,000, or €7,200 on a shorter programme.[7]

The investment stream was aimed at manufacturing. The 2022 announcement set capital investment for decarbonisation technologies at a minimum of €20,000 and a maximum of €1 million, at grant rates of 30% for a large enterprise, 40% for a medium enterprise and 50% for a small enterprise, for Enterprise Ireland, Údarás na Gaeltachta and IDA Ireland manufacturing clients. A separate energy-metering support was set at €5,000 to €50,000, at up to 50% of eligible costs.[7] The National Enterprise Hub, on 24 November 2026, still describes a capital grant of between €20,000 and €1 million per project for technologies including industrial heat pumps, electric steam boilers, heat recovery, mechanical vapour recompression evaporators and biomass boilers.[12]

Because the Green Transition Fund was designed to run to 2026, treat those pages as the live check on what is still open. This page does not say whether any stream is open or closed on a given day.

Take-up has been published only as totals. Up to the end of September 2023, a Dáil answer reported 185 approved Climate Planning Fund projects worth €1.4 million, and 33 approved Enterprise Emissions Reduction Investment Fund projects worth €5.5 million, and roughly €7 million across both streams in 2023, in the wording of that answer.[13] On 12 November 2024, Enterprise Ireland said it had approved over €55 million under the Environmental Aid scheme and the Green Transition Fund to more than 400 Irish companies since June 2022, reducing carbon dioxide emissions by an estimated 130,000 tonnes. The same announcement said the Department of Enterprise had allocated a further €300 million in June 2024 under the Environmental Aid scheme.[11] That later €55 million figure combines two schemes, so it should not be read as Green Transition Fund spend alone.

05 / how to read grant data as an account signal

How to read grant data as an account signal

In our view, a published decarbonisation grant is evidence that a supported project was planned or funded. It is not evidence that a particular supplier will be appointed, that a specified piece of equipment will be bought, or that work is still underway.

How suppliers can use the public record:

  • Separate planning support from capital support. A voucher, GreenStart, GreenPlus or energy-audit grant is a capability or intent signal. An EXEED Stage 2 award or a capital investment grant is a stronger investment signal, but it still does not identify the equipment, the site or the buying route.[3][7][12]
  • Keep official series apart. An approvals total, a payments total and an impact-report “grants supported” total can all be correct and still disagree. Quote the series you mean, with its year.[4][5][6]
  • Treat case studies as examples. A published case study names one organisation and one project. It does not represent all recipients, and it may omit later changes to scope or timing.
  • Confirm the account, not just the programme. Whether one named manufacturer received a grant, which site it covers, and whether any supplier decision remains open, has to be checked from a source that actually names that firm and that project. To rank accounts once that is checked, see industrial account prioritisation.

If you need the Irish, UK or EU manufacturers behind these programmes, the published totals stop here. Demand Range builds evidence-backed, site-level account research across Ireland, the UK and the EU, with sources and check dates on every account. Named contacts and outreach are separate scopes, not included by default.

Request a written scopeSee energy-audit signals

Prefer email? Write to partners@demandrange.com.

06 / frequently asked questions

Frequently asked questions

Is there a public list of Irish manufacturers that received decarbonisation grants?
No. Neither SEAI nor Enterprise Ireland publishes a complete public list of recipients for these programmes. What is public are the scheme rules, official totals, selected case studies and, in some cases, a company’s own announcement. A named firm’s award has to be confirmed from a source that actually names that firm.
What is the SEAI EXEED grant?
It is SEAI’s grant for more complex energy-efficiency and renewable-energy projects on non-domestic buildings and processes, including new or upgraded manufacturing processes. Support of up to €3 million per project is available in two stages: pre-investment work and capital investment. The 2026 scheme is open year-round, and applicants can apply for either stage independently.
What Enterprise Ireland decarbonisation supports should suppliers know about?
The published supports fall into planning and capital investment. Planning supports include a Climate Action Voucher of up to €1,800, GreenStart support of up to €5,000, and GreenPlus support of up to €50,000. For manufacturing processes, capital investment support was published at between €20,000 and €1 million per project. Check the live Enterprise Ireland pages, because funds have end dates.
How should suppliers use grant data as an account signal?
Treat a published award or case study as evidence that a supported project existed, not as a supplier shortlist. Planning grants are a capability or intent signal. A capital grant is an investment signal, but it does not identify the equipment, the site, the buying route or whether work is finished. Confirm those points account by account.
How is this different from energy-audit signals?
This page covers public grant and programme data for decarbonisation investment. The energy-audit signals page covers energy-audit evidence and how far it can be taken in account research. An audit is not the same as a grant, and a grant is not the same as a supplier opportunity.
07 / sources

Sources

Sources checked on 24 November 2026. Programme rules are from the official SEAI, Enterprise Ireland, National Enterprise Hub and Department of Enterprise pages and documents cited below. Totals are official published figures from those sources or from Dáil written answers. Comparisons between official series are our reading of those published figures, not a new official total. No official endorsement is implied.

  1. Sustainable Energy Authority of Ireland, Excellence in Energy Efficient Design (EXEED). Audience, eligible project types and the typical 100,000 kWh large-energy-user threshold. Accessed 24 November 2026.
  2. Sustainable Energy Authority of Ireland, EXEED capital investment supports. €3 million maximum, eligible expenditure types and the two-stage structure. Accessed 24 November 2026.
  3. Sustainable Energy Authority of Ireland, EXEED: Excellence in Energy Efficient Design, Grant Scheme Guidelines 2026, dated July 2026. Stage 1 and Stage 2 grant rates, the €3 million cap, the 65/100 minimum score, year-round applications and typical evaluation times. Accessed 24 November 2026.
  4. Sustainable Energy Authority of Ireland, Annual Report 2024. Under the EXEED programme, “in 2024 we approved grant support to 44 companies totalling €7.2 million”. Accessed 24 November 2026.
  5. Sustainable Energy Authority of Ireland, Programme Impact Report 2025, Table 3 (business sector programmes; 2024 figures in brackets). EXEED 2025 outturn: 12 grants supported, €4.5 million SEAI capital spend, €4.4 million grants awarded, an estimated €15 million private spend, 20 GWh new annual final energy savings and 4.3 kt new annual carbon savings. A version-control note in the report is dated 19 October 2026 (Appendix 3, Version 1.0). Accessed 24 November 2026.
  6. Houses of the Oireachtas, Dáil written answer by the Minister for Climate, Energy and the Environment, 18 September 2025, question 161. Table of businesses paid under SEAI programmes, including EXEED: 61 in 2023, 49 in 2024, and 36 in 2025 to the end of August. Accessed 24 November 2026.
  7. Department of Enterprise, “Government announces new funding to help businesses move away from fossil fuels”, 16 June 2022. Green Transition Fund of €55 million for 2022 to 2026; Climate Planning Fund for Business (€25 million) and Enterprise Emissions Reduction Investment Fund (€30 million), with the award ranges in the notes. Accessed 24 November 2026.
  8. Enterprise Ireland, Climate Action Voucher. Maximum award of €1,800. Accessed 24 November 2026.
  9. Enterprise Ireland, Access Advice: GreenStart. Up to 80% support to a maximum grant of €5,000. Accessed 24 November 2026.
  10. Enterprise Ireland, GreenPlus. Grant of up to €50,000. Accessed 24 November 2026.
  11. Enterprise Ireland, “Enterprise Ireland Approves Over €55 Million in Funding to Drive Decarbonisation in Irish Businesses”, 12 November 2024. Over €55 million approved under the Environmental Aid scheme and the Green Transition Fund to more than 400 Irish companies since June 2022; estimated 130,000 tonnes of carbon dioxide; a further €300 million allocated in June 2024 under Environmental Aid. Accessed 24 November 2026.
  12. National Enterprise Hub, Capital investment for decarbonisation processes. Grant of between €20,000 and €1 million per project; illustrative technology list. Accessed 24 November 2026.
  13. Houses of the Oireachtas, Dáil written answer, 23 November 2023, question 74. Green Transition Fund budget split and the 2023 take-up to the end of September 2023: 185 Climate Planning Fund projects (€1.4 million) and 33 Enterprise Emissions Reduction Investment Fund projects (€5.5 million). Accessed 24 November 2026.

This guide is researched and published by Demand Range, an Irish industrial account research business serving Ireland, the UK and the EU. About Demand Range